Renovations continue at 21st Medical Group campus Published May 12, 2015 By Lt. Col. Mark Reynolds 21st Medical Support Squadron commander PETERSON AIR FORCE BASE, Colorado -- Significant renovations continue at the 21st Medical Group. Upon completion, buildings 959 (main clinic), 725 (medical group annex) and 2012 (Area Dental Lab), will have improved patient flow and functionality. Phase two of the construction project was completed May 4, and allergy/immunizations, laboratory, optometry, public health and radiology are now open for business in their new and permanent locations within the main clinic. Allergy/immunizations and public health are now located immediately across from the main pharmacy. Both check-in desks are located on the left side of the clinic's main lobby. Laboratory and radiology are also located within the main clinic in their pre-construction locations, but are newly renovated with new check-in areas. For easy access, enter the clinic's main entrance, but do not enter the main lobby. Take the newly renovated hallway immediately to the left. Check-in and waiting areas for both departments are approximately 100 feet down the hallway on the right-hand side. Optometry also returned to its original location within the main clinic, and is newly renovated. Patient check-in is temporarily located in its pre-construction location and can be accessed through the main clinic's north entrance on the back side of the clinic. Patient administration and medical records will remain in the temporary modular facility behind the 21st Medical Group Annex until September 2015. The final phase of construction started May 4. This phase involves construction of the new entrance on the back side of the main clinic, continuation of the Area Dental Lab repairs and final renovation of the medical group annex. Access to mental health and drug demand reduction will be limited to the medical group annex northwest door until mid-August 2015, at which time it will close for canopy construction. Mental health and drug demand reduction access will then shift to the west (main front) entrance in the semi-circle drive. Allow a little extra time for your appointment and follow the new signs. Estimated project completion is September 2015, at which time patient administration and medical records will move into permanent locations within the medical group annex. The 21st Medical Group looks forward to serving all beneficiaries in its newly renovated facilities. For information about the project, call 556-5588.